Month: February 2021

Recent Post

Hanging the Heater up

Before we started on the ceiling I pulled some measurements to find the angle of the lower cord of th

While we wait…

Since my “ceiling crew” was friends helping out when time permitted I was working around

The Ceiling: Chapter 2

Happy Valentines Day! After finishing the back row of ceiling panels, I had 3 nights to prepare for S

The Ceiling: Chapter 1

Everything still looked like it did the night before at 7am when we got started. I had never worked w

Finishing up Loose Ends

With another winter approaching I was very motivated to get the ceiling done so I could have a heated

Getting the Gas Line Run

Now that I had access to the crawl space and the framing for the ceiling was in place I needed to get

Gaining Access to Crawlspace

Long before we bought the house a couple additions were added. We think the house was originally a 2

Wiring up the 4 post lifts

Up to this point I had setup the 4 post lifts to have the power units up front. I was temporally just

Stranded at work!

After ~7,500 miles on the supercharged setup and ~12,500 miles overall since buying the FRC it finall

Ceiling Framing

I took a couple days off work and worked with the contractor to get most of the nailers up in prepara