Year: 2021

Recent Post

While we wait…

Since my “ceiling crew” was friends helping out when time permitted I was working around

The Ceiling: Chapter 2

Happy Valentines Day! After finishing the back row of ceiling panels, I had 3 nights to prepare for S

The Ceiling: Chapter 1

Everything still looked like it did the night before at 7am when we got started. I had never worked w

Finishing up Loose Ends

With another winter approaching I was very motivated to get the ceiling done so I could have a heated

Getting the Gas Line Run

Now that I had access to the crawl space and the framing for the ceiling was in place I needed to get

Gaining Access to Crawlspace

Long before we bought the house a couple additions were added. We think the house was originally a 2

Wiring up the 4 post lifts

Up to this point I had setup the 4 post lifts to have the power units up front. I was temporally just

Stranded at work!

After ~7,500 miles on the supercharged setup and ~12,500 miles overall since buying the FRC it finall

Ceiling Framing

I took a couple days off work and worked with the contractor to get most of the nailers up in prepara

Plan for the ceiling

With the walls more or less done things were really starting to look…up. At this point my frien